Shift Period
Under batch schedule shift mode, "Shift Period" and "Unit of Period" will appoint a time segment, user only arrange shift during the time segment (begin at the starting time), After finish, please save it. So software will repeat the shift from starting date to end date.

For example: User set shift for several Card Holders, their working time is from Monday to Friday, Saturday and Sunday is rest time. User can set shift by following steps: 1. Select "Batch Schedule Shift" by right-clicking Card Holder list (the step can be neglected, if it was Batch Schedule Shift). 2. Select Card Holder in Card Holder list. 3. Set starting date is 2011-1-1, the end time is 2011-12-31, shift period is 7, unit of Shift is day. 4. Select Card Holder day schedule during 3rd January in day schedule list. In shift window, click 3rd January button, please repeat the step until finish the shift from Monday to Friday. 1st January and 2nd January is Saturday and Sunday, it do not need arrange shift. 5. Click "Save". Now please go to ordinary schedule shift mode, user will find out that 2011 shift is arranged for those Card Holders. The shift from 8th to 14th, 15th to 21st… is the same with 1st to 7th.

显示Why are there "*" behind property and property is bold type font?
显示Why is the saved button still forbidden after property changed?
displayWhy property is forbidden or hidden?
displayWhy property value displays multiple value and can not be displayed?